They do this to measure load vs deflection and check agreement with models, not to get anywhere close to yield. It's a low end proof check, drive trucks on, measure deflections, drive trucks off, confirm reset of deflection;

The margin on actual load to a permanent set is likely 2-3x what those trucks are carrying. And the margin to actual failure from just this quasi static loading and no external environmental loads (wind)... even more so.

Unless there was some catastrophic fuck up in construction process or calculations, this is completely safe.