Hacker Newsnew | past | comments | ask | show | jobs | submitlogin

Partly, I did the electrical work myself (dug a cable to the shed, added a breaker, etc). Asked the installer to put the panels on the roof and connect it to the existing line. The roof is low, so access was easy and they were done in a less than 2 hours, kept the cost low.


Guidelines | FAQ | Lists | API | Security | Legal | Apply to YC | Contact

Search: