The experiment SW is a lot like the buildings and labs in every physics department I've been to: everyone is on a separate 3-5 year grant cycle and as such is contractually obliged not to push for newer infrastructure. People stick to the same software/lab until it is discontinued/condemned.
The experiment SW is a lot like the buildings and labs in every physics department I've been to: everyone is on a separate 3-5 year grant cycle and as such is contractually obliged not to push for newer infrastructure. People stick to the same software/lab until it is discontinued/condemned.
[1]: https://www.discourse.org/