Was listening to a podcast where the interviewee talked about this problem in aerospace. We are quickly approaching a point in the industry where Boeing for example won't have anyone left that has been part of a clean-sheet design and production assembly line for a new passenger jet.
The 787 design & assembly line spin-up work was done 2004~2007.
The 787 design & assembly line spin-up work was done 2004~2007.