Less than 5 years. Vanity project. Built and maintained by astronaut architects. Entirely unnecessary. Poorly implemented down to the level of wire contracts being inconsistent. Overheads are insane both from engineering and operational POV.
I call this one FDD: Fuckwit Driven Development. Because if it was resume-driven I'd expect it to be something that they would want to put on their resume. But this is unmentionable.