Hacker Newsnew | past | comments | ask | show | jobs | submitlogin

But you can’t use the Boring Company’s TBM to drill ‘real’ tunnels - it’s build for tiny Tesla car sized tunnels (which aren’t actually that much larger than the local sewer being bored)

Trains i.e. proper mass transit, require wide bore tunnels and cost increases with the diameter of the bore

A lot of the costs with tunnels isn’t the tunnel but things like the portals that need to dissipate pressure waves as trains enter and leave at high speed

The boring company produced a smallish bore TBM and then ‘oh look it’s cheaper than a large one’, there is no innovation there




Consider applying for YC's Fall 2025 batch! Applications are open till Aug 4

Guidelines | FAQ | Lists | API | Security | Legal | Apply to YC | Contact

Search: