Ugh. Some guys take that technique too far and destroy cabling. I had some teams do this with power cables we rented out and they could take a 50ft coil of 4/0 copper cable and turn it into a kinked, broken mess with that technique and it always messed with our coil process that worked much like other users mentioned.
A lot of teamsters, gaffers, and grips did not like having to carry a 50lb cable further than they had to so many loved they could lay the cable down, pick up one end, and walk with it to the junction in order to lay them. (Temporary power, I mean).
As the one responsible for the department looking after that gear, those figure-eight cables were a nightmare because we'd have the prime experience of re-wrapping them all so that we could store them. That caused a time-pinch when we had to handle intake and loadouts at the same time.
I don't do that work anymore, but it's personal hahaha
A lot of teamsters, gaffers, and grips did not like having to carry a 50lb cable further than they had to so many loved they could lay the cable down, pick up one end, and walk with it to the junction in order to lay them. (Temporary power, I mean).
As the one responsible for the department looking after that gear, those figure-eight cables were a nightmare because we'd have the prime experience of re-wrapping them all so that we could store them. That caused a time-pinch when we had to handle intake and loadouts at the same time.
I don't do that work anymore, but it's personal hahaha