> Additionally, there's a few generators at the border of the grid than can operate on two different grids
Note that this wind farm is located right on the border between ERCOT and SPP (Eastern grid member). Depending on transmission capacity buildout I could imagine them being switchable.
Note that this wind farm is located right on the border between ERCOT and SPP (Eastern grid member). Depending on transmission capacity buildout I could imagine them being switchable.